The ISO performs annual studies to identify the minimum local resource capacity required in each local area to meet established reliability criteria. As part of this study process, the ISO obtains input from stakeholders on the criteria, methodology and assumptions used as inputs into the studies, and feedback on the study results. Based on the study results, load serving entities receive a proportional allocation of the minimum required local resource capacity by transmission access charge area, and submit resource adequacy plans to show that they have procured the necessary capacity.
| Development | Decision | Implementation | Completed/Closed |
|---|---|---|---|
|
Mar 23, 2026 Comments due
Apr 02, 2026 Draft final report posting Apr 09, 2026 Meeting Apr 16, 2026 Comments due Apr 30, 2026* Final report posting |